51Թ has mandated NR Brosseau to carry out the following project:McIntyre Medical Building / 21-008 - JELF, Chen.

The project consists of minor renovations of laboratory rooms 712, 723 and 726.

Project manager: Andrea Gore -Andrea.gore [at] mcgill.ca

Assistant project manager: Ellie Tayebi -Ellie.tayebi [at] mcgill.ca

Construction start date:July 7, 2023

Classified as: McIntyre, McIntyre building
Publié le: 6 juil 2023

51Թ has mandated Procova Inc. to carry out the following project: McIntyre Medical Building / 15-104 - Modification of the fourth floor electrical room distribution.

This project includes installing a second transformer to provide the required additional electrical capacity for the building and to update the emergency electrical distribution within the building.

Project manager:Emika Marinacci -Emika.marinacci [at] mcgill.ca

Classified as: McIntyre building, McIntyre
Publié le: 6 juil 2023

51Թ has mandated Corenov Constructeurs to carry out the following project:Morrice Hall / 22-038 - Priority building envelop repairs, lower roof.

The project consists of the installation of a steel structure in the library to stabilize the roof and exterior walls of the turret.

Project Manager andAssistant Project Manager:

Classified as: Morrice Hall
Publié le: 27 juin 2023

Please be advised that Facilities Management and Ancillary services (FMAS) has mandated Belmon Construction to carry out the following project:18-101 Strathcona Music - Renovation of Percussion Studios for Rooms C101 to C109 (lot 1).

The project consists of a complete renovation of the nine percussion rooms, including new layouts, acoustical treatment, audiovisual equipment, new mechanical and electrical systems, and custom storage for the instruments.

Classified as: Strathcona Music, éԴDZپDz
Publié le: 20 juin 2023

Please be advised that 51Թ has mandated Concept P.V.R. Inc.to carry out the following project : 18-156 McConnell Arena / Renovations (phase 1) – Electrical upgrade

Description :

Classified as: arena, construction, éԴDZپDz
Publié le: 20 juin 2023

51Թ has mandated Corenov Constructeurs to carry out the following project: Peterson Hall / 14-113 - Mechanical room upgrade. The project includes preparing, patching, and painting walls, repairing and levelling floor slabs, and the restoration of surfaces around the mechanical room.

Project manager:Wendy Rivera - wendy.rivera [at] mcgill.ca

Assistant project manager:Jeremy Elbaz -Jeremy.elbaz [at] mcgill.ca

Classified as: Peterson Hall
Publié le: 9 juin 2023

51Թ has mandated ARDEC to carry out the following project: Montreal Neurological Institute / 18-121 - Cyclotron.

The project consists of replacing the cyclotron's conduit.

Project manager:Eric Boutet, CIMA+ -eric.boutet [at] cima.ca

Assistant project manager:Aldo Aranza Mendoza, CIMA+ -aldo.aranzamendoza [at] cima.ca

Construction start:May 19, 2023

Classified as: MNI
Publié le: 17 mai 2023

51Թ has mandated Concreate Construction to carry out the following project: Bronfman Building / 18-089 - Infrastructure for new parking equipment.

The project consists of the reparation of the existing ramp to solve water infiltration issues and the installation of new upgraded parking infrastructure.

Project manager:André Labelle -andre.labelle [at] mcgill.ca

Classified as: Bronfman Building
Publié le: 17 mai 2023

51Թ has mandated Vitrerie RD to carry out the following project: 680 Sherbrooke / 18-106 - Mock-up curtain wall.

the project consists of the removal, survey of existing conditions and replacement of three existing window panels inside classroom 491, as well as between floors (panels above and below).

Project manager:André Labelle - andre.labelle [at] mcgill.ca

Classified as: 680 Sherbrooke
Publié le: 8 mai 2023

51Թ has mandated NR Brosseau Inc to carry out the following project: Strathcona Music / 18-101 - room E-109.

The project consists of acoustical work in room E-109 and includes the installation of a new door, door frame and new acoustic ceiling tiles.

Project manager:Wendy Rivera - wendy.rivera [at] mcgill.ca

Assistant project manager:Jeremy Elbaz - jeremy.elbaz [at] mcgill.ca

Classified as: Strathcona Music Building
Publié le: 5 mai 2023

51Թ has mandated Couvertures St-Léonard to carry out the following project:University Centre / 18-045 - roof replacement

The project consists in the replacement of the roof, skylights and storm drains.

Project managers:Eric Boutet, CIMA+ -eric.boutet [at] cima.ca

Assistant project manager:Aldo Aranza Mendoza, CIMA+ -aldo.aranzamendoza [at] cima.ca

Construction start date:May 2023

Classified as: University Centre
Publié le: 25 avr 2023

51Թ has mandated Atwill-Morin to carry out the following project:Strathcona Music Building/ 16-135 - Envelope Renovation.

Classified as: Strathcona Music Building
Publié le: 31 mar 2023

51Թ has mandated Construction Sélection SRJ Inc to carry out the following project:Technical Services Building, Macdonald Campus / 17-124 - Deferred Maintenance.

The project consist of upgrading the Welding Lab exhaust system and new teaching laboratory, as well as deferred maintenance repairs, including fire protection compliance, code compliance, mezzanine work, repairs to the envelope, installing a new ventilation unit, electrical work and civil work.

Project managers:Anne-Catherine Parent and Francois Brassard

Classified as: Technical Services Building, Macdonald Campus
Publié le: 13 jan 2023

51Թ has mandated Corenov Constructeurs to carry outthe following project: Bronfman Building / 18-094 - Computer lab 045 -046.

The project will transform existing classrooms into two computer teaching labs with new audio visual equipment-reconfiguration. The scope includes the demolition of the back walls to include storage areas as part of the new teaching labs.

Project manager:Joé Normandeau (GPH Inc.) -joe.normandeau [at] gph-inc.com

Classified as: Bronfman Building
Publié le: 14 déc 2022

51Թ has mandated Les Entreprises N.R. Brosseau Inc. to carry out the following project: Frank Dawson Adams / 21-036 - Redesigns on floors 1 & 2 to welcome librarians’ offices

Classified as: Frank Dawson Adams Building, FDA, Adams Building
Publié le: 12 déc 2022